QCS Labs · Orbital point-to-point delivery
Orbital logistics,
priced against air freight.
OPD is a research concept from QCS Labs. It asks at what launch cost it becomes financially rational to send time-critical cargo between continents on a suborbital or orbital arc instead of a long-haul flight, and what else has to be true first.
This is a long-horizon research thesis. It is not a product or a service, Quantum Cyber Solutions does not operate launch vehicles, and nothing on this page is offered for sale.
The thesis
As launch gets cheaper, the first freight moves to space.
The cost of putting a kilogram into low Earth orbit has fallen by more than an order of magnitude since the Space Shuttle era. The cause is reuse: boosters that land and fly again. Developers of fully reusable heavy-lift vehicles are aiming far lower still.
Freight follows price. Bulk goods will not move through space on any cost curve we can see. The first cargo to cross is the small share for which a day of delay costs far more than the freight bill: a medical isotope that decays in hours, or the part that is keeping an aircraft or a production line idle.
Our thesis is that this crossing is a matter of cost and operations, and that the logistics industry should understand the break-even points before the vehicles exist. The idea is not ours alone. Launch providers and government research programs have studied rocket cargo. Our interest is the economics and the planning problem.
Approximate cost to low Earth orbit, US dollars per kilogram
- 01
Space Shuttle era
1981 to 2011
Roughly $40,000 to $65,000 per kg
A crewed, partly refurbished system. Cost per kilogram stayed in the tens of thousands of dollars.
- 02
Expendable heavy lift
1990s to 2010s
Roughly $8,000 to $20,000 per kg
Commercial and government rockets flown once and discarded.
- 03
Reusable boosters
Late 2010s to today
Roughly $2,000 to $4,000 per kg
The first stage lands and flies again. List prices fell to the low thousands of dollars.
- 04
Reusable heavy lift
2018 to today
Roughly $1,200 to $2,000 per kg
Larger vehicles with recovered boosters spread the cost over more payload.
- 05
Fully reusable heavy lift
Stated targets
Roughly $20 to $500 per kg (target, not demonstrated)
Targets published by developers for vehicles still in flight test. Not a demonstrated price.
Figures are approximate and for illustration. They are rounded ranges based on widely cited public estimates, which differ by source, vehicle and year.
Illustrative model
Set a launch cost and see which freight crosses break-even.
The chart places each era of launch on a log scale. Move the slider, or click the chart, to assume a cost per kilogram. A freight class crosses when the delivered cost falls below what its shippers might pay to turn most of a day into about an hour.
- Critical medicalShort-lived radiopharmaceuticals, transplant logisticsNot yetbelow $1,000/kg
- Line-down spare partsAircraft-on-ground and plant-stoppage componentsNot yetbelow $200/kg
- High-value electronicsSemiconductor tooling, prototype hardwareNot yetbelow $52/kg
- Emergency responseFirst-day disaster relief equipmentNot yetbelow $22/kg
- Premium perishablesFresh seafood, cut flowersNot yetbelow $10/kg
- General parcelsEveryday e-commerceNot yetbelow $3/kg
Assumes express air freight at $5 per kg, a delivered cost of 3 times launch cost, and a premium each class would pay for delivery within hours. All three are illustrative assumptions.
This is an illustrative model, not a forecast. The eras are numbered as in the list above and drawn as ranges, not datapoints. The model considers price only. At any cost on this chart, the vehicles, spaceports and rules needed to fly freight this way do not yet exist.
Time
The same great circle, flown two ways.
An aircraft and a suborbital vehicle between the same two cities trace the same path over the ground. One stays in the atmosphere at cruise speed. The other leaves it, coasts and returns.
The clock runs to the suborbital arrival, then speeds up until the aircraft lands. Choose a route, or drag the globe to turn it.
Flight times are illustrative. Air assumes 880 km/h cruise plus 36 minutes for climb and descent. Suborbital assumes an average ground speed of 6.5 km/s plus 10 minutes for ascent and landing. Neither includes loading, range clearance or the transfer to and from a launch site, and the arc height is not to scale.
Economics and logistics
What has to be true.
Cost per kilogram is necessary and not sufficient. Each of these has to hold before a single lane makes commercial sense, and most do not hold today.
Cost per kilogram
Status today
Partly reusable vehicles fly commercially at low thousands of dollars per kilogram. Lower figures for fully reusable vehicles are developer targets, not prices anyone can buy today.
Turnaround
Status today
Recovered boosters are reflown after days to weeks of inspection and refurbishment. Same-day reuse of a whole vehicle has not been demonstrated.
Reliability
Status today
The most flown rockets have strong ascent records over hundreds of launches. That is still well short of commercial aviation, and routine propulsive return of a cargo vehicle is at the flight-test stage.
Spaceports
Status today
Orbital launch sites are few and mostly remote. Offshore platforms have been proposed for this purpose. None operates as a freight terminal.
Regulation
Status today
National launch and reentry licensing exists and is built around individual missions. No framework exists for scheduled point-to-point cargo between countries.
Payload handling
Status today
Capsules return cargo from orbit regularly at small scale and with slow recovery. Containerized handling for this environment has not been designed.
Last-mile integration
Status today
No integrated operation exists. This is where conventional logistics planning, and our own routing work, would apply first.
Demand density
Status today
Unknown. Time-critical goods are a small share of air cargo by weight. Sizing that demand lane by lane is one of the first research questions.
Where quantum and AI fit
A scheduling and routing problem before it is a rocket problem.
QCS does not build vehicles. Our part of this is the planning layer: deciding when to fly, from where, and how each shipment connects on the ground.
These are optimization problems. Classical solvers and machine learning forecasts are the right tools for them now. Whether quantum annealers or hybrid solvers add anything at the scale of a launch network is an open research question, and we would test it against a tuned classical baseline, as we do in our ground logistics work.
- 01
Launch window scheduling
Each departure has to fit weather, range availability, airspace closures and traffic in orbit. Choosing windows for a fleet across several sites is a constrained scheduling problem of the kind we already formulate for ground fleets.
- 02
Multi-leg routing
A shipment moves by road to a pad, through the arc, then by road, air or drone to its destination. The plan has to choose pads and connections together, and re-plan when one leg slips.
- 03
Fleet and turnaround assignment
Which vehicle flies which lane, where it is serviced and when it is ready again. The same structure as aircraft tail assignment, with tighter coupling between legs.
Future expansions
Two ideas we are holding for later.
Neither is needed for the core thesis. Both are recorded here so the research has somewhere to grow.
Drone delivery for the last mile
A landing site outside a city leaves a final leg to cover. Autonomous aircraft could carry small, urgent consignments from the pad to a hospital or a factory without joining road traffic.
This depends on drone regulation, range and payload limits that are still developing in their own right. It is a later extension of the concept and not part of the core thesis.
The Rothagorean theorem
This is our founder's working name for a routing geometry idea. Surface and air transport pay for every kilometer, so time and cost grow roughly in proportion to distance. A route that leaves the atmosphere pays a large, roughly fixed price to climb and to descend, and the distance covered in between adds comparatively little. In its simplest form, total time is ascent plus coast plus descent.
If that holds, there is a crossover distance beyond which going up and over costs less than going around, and the crossover moves closer as launch gets cheaper.
It is an unpublished working idea. We do not claim it is proven or new, and it rests on simplifications: the energy needed does grow with range, and reaching altitude is far easier than reaching the speed required to cross an ocean. If it survives a rigorous write-up, that paper will be listed in the research library below.
Research library
Papers and working notes.
This page is the home for the research as it is written up.
No papers published yet
Papers, working notes and models will be listed here as they are published.
Research agenda
- 01
Break-even by freight class
Replace the illustrative premiums on this page with shipper data and published air cargo rates, lane by lane.
- 02
Door-to-door time
Model the ground legs, loading and range clearance, which decide whether an hour of flight becomes a same-day delivery.
- 03
Scheduling formulation
Write launch window and multi-leg routing as optimization problems and benchmark classical solvers before anything else.
- 04
Routing geometry
Test the fixed-cost-plus-coast idea against real trajectory energy requirements and state where it fails.
Funding and collaboration
Help us test the thesis.
OPD is at the concept stage. We are open to conversations with researchers, logistics operators and funders who want to examine the economics with us, including where the argument is weakest.